Explore our supply
RFQ ↗

ED-01

Bitumen

We coordinate sourcing for penetration, viscosity and oxidized grades. Tell us the application, destination, quantity and required test method so the commercial offer can be checked against the right specification.

60/70 · 80/100 · VG 30 · VG 40 · 85/25

Grades & scope

60/70 · 80/100 · VG 30 · VG 40 · 85/25

From road construction to industrial waterproofing. A specification-led approach to every cargo.

Applications

Roads & paving / Industrial waterproofing / Asphalt production

Technical documents

Request the technical data sheet, safety data and batch-specific documents with your enquiry. Documents are confirmed for the proposed grade and source.

Technical selection notes

What to include in your enquiry

  1. Project standard & climate
  2. Penetration / viscosity / oxidized grade
  3. Required test limits and method
  4. Bulk, drums or jumbo bags
  5. Receiving equipment & handling plan

TECHNICAL / BITUMEN

Read the specification. Understand the material.

A purchasing checklist, not a certificate of conformity. Agree the test method, edition, limits and sampling requirements; confirm results on the producer’s batch COA.

Read the specification. Understand the material.
PropertyMethod / unitWhat the buyer should verify
Penetration · 60/70, 80/100ASTM D5/D5M · 0.1 mmHigher penetration indicates softer consistency. Common reference conditions are 25°C, 100 g and 5 s. Confirm all contractual limits, not only the grade name.
Viscosity grading · VG60°C · poise / 135°C · cStVG specifications evaluate absolute viscosity at 60°C and kinematic viscosity at 135°C. VG 30 is not simply another name for penetration 60/70.
Softening pointASTM D36/D36M · °CRing-and-ball softening point is a defined test result, not a sharp melting point. Interpret it with penetration and the application standard.
Aging & retained propertiesRTFOT / TFOT · contract methodRequest the specified aging procedure and limits for residue properties. An unaged result cannot substitute for an aged-binder requirement.
Density & package compatibilitykg/L · stated temperatureA fixed “kg per drum” cannot be assumed for every grade or drum. Confirm net mass, internal capacity, tare, fill allowance and the packing process.
SDS & receiving conditionsSupplier SDS · loading approvalHot bitumen can cause severe burns; water contact and H₂S exposure require specific controls. Confirm a compatible, dry receiving system and approved handling procedures.

Technical buying questions

Can penetration and VG grades be substituted?

Not by grade name alone. The systems test different properties. The project engineer must accept the full specification and test results before a substitution.

Can I use an ordinary IBC for hot bitumen?

Do not assume compatibility. This planner excludes generic IBCs for bitumen. Hot filling and bulk shipment need product-specific equipment, thermal allowance and supplier-approved handling.

Does a container estimate count as VGM?

No. VGM requires verification under the applicable approved method. Net material, packages, pallets, securing materials and container tare must all be accounted for.

EASTERN DIAMOND

Let’s move your next requirement forward.

Request a quotation ↗